01
304 stainless
It holds one season against the spray. Two, if the house sits sheltered. Then it pits, and the stains never come out.
Fer & Sel
ENFR
Art ironwork · Gustavia, St Barths
Railings, gates, steel-framed glass and outdoor furniture in 316L stainless and forged iron. Drawn, welded and installed on St Barths, for houses a hundred meters from the water.
Shop open Monday to Friday, 7 a.m. – 4 p.m.
Zone artisanale de Public, St Barthélemy

Salt
304 stainless is a fine steel. In Paris. A hundred meters from the shore, spray leaves chlorides that break through its passive film. First small brown pits. Then corrosion working under the surface, where nobody sees it until the part gives way.
316L carries molybdenum. Two to three percent, no more, and that is the whole difference: the film heals instead of breaking. It is the only grade we put outdoors, anywhere on this island.

01
It holds one season against the spray. Two, if the house sits sheltered. Then it pits, and the stains never come out.
02
Molybdenum blocks the chlorides. Rinsed with fresh water twice a year, it stays clean for twenty years.
03
It has no passive film at all: hot-dip galvanizing, primer, paint, patina. Four coats, not three.
04
304 stainless outdoors. Zinc-plated fasteners in a seaside fixing. A weld ground flat and painted over to hide poor penetration.
What the shoreline does to each material
Materials
None of them are farmed out. What leaves this shop was drawn, cut, welded and finished by the same hands.
01
Railings, handrails, pool gates
Brushed to a 240 grit or mirror-polished. TIG welds under gas, pickled and then passivated: the step everybody skips.
02
Gates, grilles, signs, interior railings
Forged hot on the anvil. Galvanizing, epoxy primer, then a wax or walnut-stain patina.
03
Hardware, handles, sconces, light fixtures
Brass ages instead of rusting. We let it turn, or lacquer it if you would rather keep it bright.
04
Glass partitions, verandas, entrance canopies
20 mm steel profiles, laminated glass, installation included. Counted in weeks, not months.

The shop
Fer & Sel is four people in the Public industrial zone. The drawing, the welding and the installation are done by the same people. Nobody discovers the job on installation day.
We work with the island architect when there is one, and straight with the owner when there isn't. Either way, we come and measure before we price.
01
Site survey, dimensioned plan, layout. You see the piece before it exists.
02
Cutting, welding, finishing. Nothing leaves until the bead is clean.
03
Stainless chemical anchors, shimming, sealing made good. We come back at six months.
What holds
Railing installed in 2019, due east, facing open water. Rinsed twice a year, it still looks new. The quoted price was the price we paid.
They refused to patch up the neighbor's 304 gate and told me exactly why. In ten minutes I understood what three other companies never explained.
Quote
No ballpark over the phone. We come by, we survey, and you get a firm price with the drawing.
01
Two lines are enough: what you want, and where.
02
On-site survey, half an hour as a rule.
03
Dimensioned drawing, stainless grade, build time, firm price.
Three fields. We call you back, we don't fill your inbox.